PRODUCT LISTS
| China coal chemical equipment manufacturing leadin |
| Xinjiang daily news (reporter Zhong Xiuling reported) from Hami Xinjiang district development and Reform Commission was informed that: in May 28th, the construction of large coal chemical equipment manufacturing base in Hami Industrial Park started construction by the blue stone group. The move shows that China's largest coal chemical equipment manufacturing enterprises officially settled in Xinjiang. It is understood that the blue stone group is a Sinopec (600028, stock it) machinery industry and the founder of China's energy equipment industry leading enterprises. In recent years, Lanshi group relying on its in the traditional advantages in oil refining chemical equipment manufacturing, increasing core of coal chemical complete sets of equipment developed and made breakthrough progress, with R & D manufacturing of the world's most advanced coal chemical core equipment and super large-scale coal chemical project EPC general ability. As the core equipment of coal chemical equipment is a large overweight products, railways, roads can not transport. Therefore, the equipment construction of the nearest local production, on-site installation and commissioning of the strategy. To fully adapt to the coal chemical equipment, product features, give full play to the technical superiority of Xinjiang Hami Coal resource advantage and Portland stone group, Lanshi group and Hami areas through demonstration and investigation and careful preparation, the project with the formal construction of the conditions. The project construction period is controlled in 5 months, is expected to be completed and put into operation in October this year. Project forward investment 1 billion 200 million yuan, annual income of 1 billion 600 million yuan. According to reports, Xinjiang development of coal chemical industry has a unique advantage. Autonomous Region in 12th Five-Year planning to include coal gas, including the coal chemical industry as the focus of regional industrial development, plans to build in 2015, 60 billion cubic meters of natural gas production capacity of coal. At present, our district has been approved by the state to carry out preparatory work of the 10 coal gas demonstration project, the total construction scale of more than 40 billion cubic meters / year, with a total investment of more than 300 billion yuan. Earlier this month, Xinjiang coal gas project also won the State Development Bank financing of a huge sum, Xinjiang branch of China Development Bank in the next three years will focus on promoting the quasi East, Ili national comprehensive demonstration area in four to five key coal gas project, and strive to more than 500 million yuan of the total financing. |
